Skip to content

THE PLATFORM

A CDE that follows the project, not the other way around.

DesignBB organizes information according to ISO 19650 and adapts to each stage: what gets produced, what gets reviewed, what gets approved, and what gets built.

Every container knows what state it's in.

WIP

Work in progress. Visible to the team producing it.

In review

Sent to the review team. Each document awaits its decision: approved or returned.

Shared

Approved in review: the stable version the other disciplines work from.

Published

Issued. It's what's used for bidding and construction.

Archived

Superseded content, viewable and unaltered.

01 — SUBMISSIONS AND REVIEW

The sheet is the unit. The verdict, no gray areas.

Every upload is a set. The review decides document by document: approved or returned. Whatever is returned gets corrected and resubmitted, and on close, the approved set is sealed and immutable. Recipients see only what's current.

Review R-03 · ArchitectureCycle 3
TRV-EBA-ZZ-00-PLA-ARQ-0101Approved
TRV-EBA-ZZ-01-PLA-ARQ-0102Approved
TRV-EBA-ZZ-ZZ-PLA-ARQ-0201Returned
TRV-EBA-ZZ-ZZ-PLA-ARQ-0301Approved
On close → Approved set 08Sealed
Received informationProject inbox
R-0142 · Soil studyAdmittedEmail · Geotechnical consultant · Topic: Foundations
R-0143 · Municipal drawingsAdmittedIn person · Municipality · Topic: Regulations
R-0144 · Site surveyReceivedWhatsApp · Surveying · Topic: Site
02 — RECEIVED INFORMATION

Nothing enters the project without leaving a trace.

Before modeling, every discipline receives information. DesignBB logs every receipt with its channel, sender, date, and topic, and keeps what arrived separate from what has been admitted: only then does the team use it as reference.

03 — COORDINATION

Coordinate before you issue.

Build clash capsules from each discipline's stable versions, in IFC. Clashes come grouped by type and level, and you decide: this is an issue, or it isn't. Several clashes can go into a single issue, with an assignee. Coming soon, the AI assistant will summarize the capsule and propose how to resolve it.

Clash capsule · EST × ARQ × SANSummarize and propose
Ø110 pipe × Beam · 3 clashesIssue I-13
Rainwater downpipe × Slab · 1 clashUnclassified
Wall × Column · 2 clashesNot an issue
AI · coming soon — 3 clashes share the same cause. Proposal: shift the plumbing run 15 cm on level 1.
04 — FROM REVITCOMING SOON

The CDE inside the model.

A side panel in Revit: you'll sign in, send drawings and IFC as a new set, and respond to comments without leaving the model.

05 — PUBLIC LINKSCOMING SOON

Show the model to people without an account.

You'll be able to share a stable version with a view-only link. The project owner will be able to turn off every public link with a single control.

06 — CLASSIFICATION

No free text. No duplicates.

95 disciplines and 174 document types, following buildingSMART Spain. A-101, A101, and A 101 are always the same drawing.

Try it on a real project.

Trial Mode: one project of up to 200 m², one time only, to try every capability.

Start in Trial Mode See pricing